A complete set of large-screen LCD splicing system , in addition to the front of the screen , the will to involve computers, networks , video surveillance, integrated wiring and numerous peripherals and many other devices , these features also created a large-screen LCD splicing system installation complex and difficult characteristics. In fact, in addition to these features , large-screen LCD splicing system for engineers not only have excellent engineers and technicians , but also have strong project management and operational capacity , only to have these features in order to respond flexibly to various installation projects .
Typically, large-screen LCD splicing system project can be divided into four distinct phases , namely: project planning, preliminary survey , project implementation and post-project . Among these four stages , pre- survey and implementation of the project is very important, if these two stages in the implementation process problems, will seriously affect the progress of the projects and the quality of the projects . Before the implementation of the project -based investigation and implementation of two parts which need to pay attention to what ?
First, the pre-construction survey points:
Pre-construction survey in addition to the construction site in person to understand the investigation , they also need to conduct a detailed and customer communication , and make the overall construction project planning , as these largely determines the length of the project cycle , cost control, and rendering the final result , it must be particularly careful.
1 First, install the equipment on the ground to be flat.
Because the entire large-screen LCD splicing system weight is very large especially rear stitching, its technology determines its cabinet is very large, and very heavy, so if the floor is ceramic tile installation of equipment , it must first confirm whether it can withstand such weight , preferably fixed on another device antistatic floor on the ground, in order to ensure long-term ground by heavy deformation.
2 , followed by wiring
Large-screen LCD splicing system wiring, power lines and signal lines to be separated in order to avoid unnecessary interference with the signal ; another big screen COG LCD Display splicing according to the specifications , the cabinet position , the signal source location for all kinds of lines calculated cable length , number of joints and the signal line names. But also confirm with the customer , project pipeline channel is available to meet the actual needs, in order to continue follow-up work .
3 , ambient light
Because large-screen LCD splicing products brightness is relatively limited, if the system of ambient light is too bright , the picture effect would have been affected . Under normal circumstances, required within 4 meters in front of the screen is dark , it is best not to install fluorescent tubes can be installed concealed downlights , light to shine directly on the screen can not and must have a separate switch.
In addition to the installation of tube lights and large screen devices in parallel , try to make the work area has adequate lighting , but will not have a significant impact on the screen , the screen may be near the incoming light ( such as windows ) , if necessary, to be blocked while the device is running best to turn off the light ,16x2 lcd in order to ensure normal operation of equipment .
4, the framework requires
Taking into account the convenience of installation and maintenance , the frame must be removable edging edging . Outside the framework of the fight away from the wall along the side ( up and down about four sides ) set aside about 25mm clearance on each side , a large video wall should be increased according to the number of columns margin . In addition , in order to post into the box maintenance, repair channel principle is not less than 1.2m wide. Removable side bar to hold the edge of the screen 3-5mm is appropriate, in the box and the screen is fully in place, and finally fixed removable trim.
OLED Module technology and development with echoes, OLED drive also plays an increasingly important role. Not only from the low duty cycle increases to support high duty cycle, and the application of such a control current for each RGB, wider IC operating temperature (-45 to 80 ℃), the internal DC-DC boost, as well as graphics acceleration instruction and some other features.